Docklands Data Centre
Client: Docklands Data Centre
Project Details:
Connaught Access Flooring carried out the installation of an extra heavy grade raised access floor to the Technical Building areas and Data Halls over 3 floors of a recently constructed Docklands Data Centre.
We commenced our works with the floor painting prior to the raised floor installation. The main installation of the raised floor was complete in seven weeks.
The floor paint works which included the application of an Altro Solo DPM coat was the specified J30 Altro Tect floor paint from Altro Floors. The floor panels were the K41 Specified Bathgate Extra Heavy Grade System and were supplied with a mixture of vinyl and carpet pre-bonded floor finish as per the Construction Issued Floor Finishes Schedules. The pedestal bases in all areas were four times mechanically fixed per pedestal and all pedestals were nickel plated to prevent the formation of Zinc Whiskers.
Connaught also delivered and installed K41 specified Heavy Duty Floor Grilles from Gilbert’s of Blackpool as well as slave flooring in areas of high traffic and grille locations. We also completed a void clean after the main system installation and then an additional clean after the installation of all under floor services.
Attendance was given to all Mechanical, Electrical and Data Cabling Services installations.
Contract Duration: 5 months